The Contractor will continue work at the new 15th Avenue Pump Station tomorrow. There will be no work on Thursday November 26 and Friday November 27 due to the Thanksgiving Holiday.
Work will resume on Monday November 30 at the 15th Avenue Pump Station as well as some potholing activities on 16th Avenue and Geoffroy Drive throughout next week.
Excavation of pits for the trenchless pipe work is expected to begin the following week (December 7, 2015) and continue throughout the month. Specific schedules for each street will be provided as the work approaches each area.
Tuesday, November 24, 2015
Monday, November 9, 2015
Trench Work at the 15th Avenue Pump Station
The Contractor will be taking advantage of a break in the weather to do some trench work in the driveway of the 15th Avenue Pump Station. The work will begin tomorrow, November 10th, and is scheduled to be complete by Thursday, November 12th.
During the driveway work, expect equipment to be moving between the pump station and staging area at the end of 15th Avenue with minimal traffic impact. Once the work is complete, the Contractor will continue potholing work.
During the driveway work, expect equipment to be moving between the pump station and staging area at the end of 15th Avenue with minimal traffic impact. Once the work is complete, the Contractor will continue potholing work.
Thursday, November 5, 2015
Potholing Activity on 14th, 15th, 16th, Blackpoint Lane, and Geoffroy Drive
The Contractor began potholing today and will continue potholing through next week. A pothole is a small, localized area of excavation to confirm the location of underground utilities. Affected areas will be restored with temporary paving after the potholing activities have been completed. The activities will be taking place in the locations noted below.
Short traffic delays may be experienced around the construction crew. We ask that everyone follow the Contractor's instructions to safely pass the construction areas. If you have any questions, feel free to call the project line at: (831) 708-8285.
Short traffic delays may be experienced around the construction crew. We ask that everyone follow the Contractor's instructions to safely pass the construction areas. If you have any questions, feel free to call the project line at: (831) 708-8285.