Tuesday, May 31, 2016

Paving on Blackpoint Lane

The Contractor is beginning paving operations on Blackpoint Lane this morning. The new pavement is expected to be complete by the end of the day today. During the work, Blackpoint Lane will be closed to vehicle traffic. Residents are encouraged to park vehicles in the reserved parking area in the East Cliff Village parking lot and walk past the work zone.

Additionally, the Contractor will begin removing the existing pavement on 16th Avenue this morning.  Vehicle traffic is encouraged to use Geoffroy Drive to bypass the construction on 16th Avenue. The Contractor is expecting to place new pavement on 16th Avenue as soon as this afternoon.

Work is also continuing at the south end of 14th Avenue on the new grinder pump stations.

Wednesday, May 25, 2016

Paving Schedule Update

The Contractor has completed trench paving on 14th Avenue, and today will be starting paving on 15th Avenue. There will be no paving work for the remainder of the week. Paving work will resume on Tuesday, May 31st at Blackpoint Lane after the Memorial Day Holiday.

The Contractor will also continue lateral work at the end of 14th Avenue through the end of the week, and will continue abandonment and clean-up operations over the next couple of weeks throughout the project site.

Monday, May 23, 2016

Final Paving Beginning Soon

The Contractor brought their paving crew on-site this morning to mark and prepare for the final paving. The first phase of paving will begin on Tuesday morning at the south end of 14th Avenue and continue north towards East Cliff Drive. The paving crew will then move to 15th Avenue and work their way south toward the 15th Avenue pump station. This work is expected to be complete by the end of the day Wednesday.

The second phase of paving will take place Thursday and Friday and include work in the intersection of East Cliff Drive and 15th Avenue. During this work, the Contractor will be redirecting one lane of traffic into the center lane at a time.

The third and final phase of paving will take place Tuesday and Wednesday of next week and will include work on Blackpoint Lane, 16th Avenue and Geoffroy Drive. We will update you with more information as it becomes available.

Additionally, the Contractor is continuing work on the 15th Avenue Pump Station control panel enclosure and replacing a water line at the end of 15th Avenue.

Thanks again for your continued cooperation in the final phases of the project!

Monday, May 16, 2016

Work at 15th Avenue and East Cliff Drive

The Contractor will be installing a new drop connection in the manhole at the 15th Avenue and East Cliff Drive intersection today. Expect a small crew working in the intersection.

Traffic in the west bound lane is being temporarily redirected into the center lane around the work area. Please proceed through the area with caution.

Friday, May 13, 2016

Upcoming Work at 15th Avenue and East Cliff Drive Intersection

Today, the Contractor will begin demolition of the 16th Avenue pump station. You will notice a small crew and some heavy equipment on the side of Geoffroy Drive during the demolition.

Next week, the Contractor will be working in the intersection of 15th Avenue and East Cliff Drive to install a drop connection for the new force main. During the work, the Contractor will have traffic control signs and cones set up. Please pay attention to the Contractor's instructions and be alert when driving near the construction.

The final section of concrete at the 15th Avenue pump station driveway was poured last Tuesday. The driveway will be reopened next Monday.

Have a great weekend!

Friday, May 6, 2016

Geoffroy Drive Update

Due to unforeseen issues, the Contractor actually began the manhole tie-ins on Geoffroy Drive yesterday with work continuing in to next week. Geoffroy Drive will be closed during the course of the work. Thru traffic will be able to access the south side of Geoffroy Drive via 16th Avenue.

The 15th Avenue pump station driveway restoration remains on schedule with work expected to be complete by the end of next week.

Thanks for your continued cooperation!

Tuesday, May 3, 2016

Geoffroy Drive and 15th Avenue Pump Station Driveway Work

The Contractor will begin the manhole tie-ins on Geoffroy Drive tomorrow morning and is expecting the work to be completed by the end of next week. Geoffroy Drive will be closed during the course of the work. Thru traffic will be able to access the south side of Geoffroy Drive via 16th Avenue.

The 15th Avenue pump station site restoration is progressing nicely with the new driveway currently being installed. The driveway is expected to be complete by the end of next week as well.

As always, feel free to call the project information line with any comments or questions.